Resource Center

Access design tools, technical documents, and install resources to support every phase of your project. Built for specifiers, procurement teams, and installers working with Stormflow Surfacing.

Loading, please wait...

Explore Stormflow Surfacing in Detail

Stormflow is a resilient, ADA-compliant permeable paving system engineered for high-traffic environments and long-term performance. It’s suitable for a wide range of applications, including municipal infrastructure, public spaces, educational campuses, and commercial developments. The Resource Center provides access to technical specifications, CAD files, and documentation to support planning, procurement, and installation workflows.

Browse a selection of open resources below. To access the full library, including technical specifications and CAD files, create a free account.

UW Compressive Strength

The material's compressive strength was tested according to ASTM D1074 Standard

Access Report
Sheridan Water Research

Testing of the permeable paver profile shows that it does not introduce harmful contaminants into water, confirming its environmental safety. However, it does not significantly reduce soluble ions like sodium and chloride. These results highlight the system’s effectiveness in general filtration while identifying areas for improvement when targeting specific ionic pollutants.

Access Report
Life Cycle Cost Analysis - Full Report

The LCCA carried out in this assignment concluded that Stormflow is comparable in cost to impermeable concrete pavement, which does not provide infiltrationof rainfall andless than PICP, over a 40-year analysis period. The observed performance and LCCA results of Stormflow demonstratethe suitability of its use in comparison to other permeable pavement and LID alternative

Access Full Report
Life Cycle Cost Analysis - Executive Summary

The LCCA carried out in this assignment concluded that Stormflow is comparable in cost to impermeable concrete pavement, which does not provide infiltrationof rainfall andless than PICP, over a 40-year analysis period. The observed performance and LCCA results of Stormflow demonstratethe suitability of its use in comparison to other permeable pavement and LID alternative

Access Report
Infiltration Study - Full Report

All sites (5 studied) have all maintained infiltration since construction without any maintenanceefforts being implemented to restore permeability. Apart from Site 3, the infiltration throughout all the sites exceeded the rainfall intensity of 292.5 mm/hr expected for a 100-year storm that is 5 minutes in duration. At Site 3 more than half the test locations had an infiltration rate that exceeded the maximum rainfall intensity of 292.5 mm/hr (5 min duration, 100-year storm). The maximum infiltration rates demonstratethe anticipated performance of Stormflow during rain eventshaving high intensity and short duration

Access Full Report
Infiltration Study - Executive Summary

All sites (5 studied) have all maintained infiltration since construction without any maintenanceefforts being implemented to restore permeability. Apart from Site 3, the infiltration throughout all the sites exceeded the rainfall intensity of 292.5 mm/hr expected for a 100-year storm that is 5 minutes in duration. At Site 3 more than half the test locations had an infiltration rate that exceeded the maximum rainfall intensity of 292.5 mm/hr (5 min duration, 100-year storm). The maximum infiltration rates demonstratethe anticipated performance of Stormflow during rain eventshaving high intensity and short duration

View the Report
Installation Drawings

A collection of application-specific layout drawings to support accurate, code-compliant installs. Includes standard edge details, slope guidelines, and surface profiles.

Download the Drawings

Explore Stormflow Surfacing in Detail

Stormflow is a resilient, ADA-compliant permeable paving system engineered for high-traffic environments and long-term performance. It’s suitable for a wide range of applications, including municipal infrastructure, public spaces, educational campuses, and commercial developments. The Resource Center provides access to technical specifications, CAD files, and documentation to support planning, procurement, and installation workflows.

UW Compressive Strength

The material's compressive strength was tested according to ASTM D1074 Standard

Access Report
Sheridan Water Research

Testing of the permeable paver profile shows that it does not introduce harmful contaminants into water, confirming its environmental safety. However, it does not significantly reduce soluble ions like sodium and chloride. These results highlight the system’s effectiveness in general filtration while identifying areas for improvement when targeting specific ionic pollutants.

Access Report
Life Cycle Cost Analysis - Full Report

The LCCA carried out in this assignment concluded that Stormflow is comparable in cost to impermeable concrete pavement, which does not provide infiltrationof rainfall andless than PICP, over a 40-year analysis period. The observed performance and LCCA results of Stormflow demonstratethe suitability of its use in comparison to other permeable pavement and LID alternative

Access Full Report
Life Cycle Cost Analysis - Executive Summary

The LCCA carried out in this assignment concluded that Stormflow is comparable in cost to impermeable concrete pavement, which does not provide infiltrationof rainfall andless than PICP, over a 40-year analysis period. The observed performance and LCCA results of Stormflow demonstratethe suitability of its use in comparison to other permeable pavement and LID alternative

Access Report
Infiltration Study - Full Report

All sites (5 studied) have all maintained infiltration since construction without any maintenanceefforts being implemented to restore permeability. Apart from Site 3, the infiltration throughout all the sites exceeded the rainfall intensity of 292.5 mm/hr expected for a 100-year storm that is 5 minutes in duration. At Site 3 more than half the test locations had an infiltration rate that exceeded the maximum rainfall intensity of 292.5 mm/hr (5 min duration, 100-year storm). The maximum infiltration rates demonstratethe anticipated performance of Stormflow during rain eventshaving high intensity and short duration

Access Full Report
Infiltration Study - Executive Summary

All sites (5 studied) have all maintained infiltration since construction without any maintenanceefforts being implemented to restore permeability. Apart from Site 3, the infiltration throughout all the sites exceeded the rainfall intensity of 292.5 mm/hr expected for a 100-year storm that is 5 minutes in duration. At Site 3 more than half the test locations had an infiltration rate that exceeded the maximum rainfall intensity of 292.5 mm/hr (5 min duration, 100-year storm). The maximum infiltration rates demonstratethe anticipated performance of Stormflow during rain eventshaving high intensity and short duration

View the Report
Aggregate Base Preparation

Outlines the proper preparation of the sub-base to ensure effective drainage, load-bearing stability, and long-term surface integrity for Stormflow installations.

Download the Documentation
Installation Drawings

A collection of application-specific layout drawings to support accurate, code-compliant installs. Includes standard edge details, slope guidelines, and surface profiles.

Download the Drawings